Infrastructure

 

INFRASTRUCTURE

 
I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
:       44.
 
:       YES
 
 
:    15:01:1996  
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
: (Completed / Incomplete)  Completed
 
¼ brick wall
¾ barbed wire fencing
iii
Permanent buildings constructed
 
 
: (CBRI pattern/ CPWD pattern)
 
    CBRI
iv
School building
: Completed
v
Dormitories
:  Boys    04 Nos.
   Without  Warden Residence______ Nos.
 
 
:  Girls 03 Nos.
   without Warden Residence______ Nos.
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
:  Complete, Area ______
 
 
    two
vii
Principal Residence
:  01  No.
viii
Staff Quarters
 
 
 
 
: Type III = 28 Nos.
  Type II =   00 Nos.
  Type  I  =  02 Nos.
  SP Sheds converted into Staff Qrs.:10 Nos.
ix
M.P. Hall
 
: Available
x
Workshop
 
:  not available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
:OHT work in progress 
:  _______ litres
 
: Working satisfactory / not satisfactory
xii
U.G. tank
 
Its capacity
 
Present Status
 
:  10,000  litres(temporary)
 
: Working satisfactory / not satisfactory
xiii
D.G. Set
 
 
 
 
:  Available
: Kirloskar make
:  10  KV
: Working
:  Year of procurement
 
xiv
Sewage Pump
 
: Nil H.P.
xv
Water Pump
 
 
: 7.5 HP capacity
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
 
 
 :  Urban Feeder
:  Complete
: 38 Nos. of Poles
 
: 10 to 15 hrs.
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
 
 
: 200meter track available
:  01,under cunstruction
:. not available
 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
 
 
: nil
: Potable, 02 Nos.-  working
:  nil
xix
Rajiv Gandhi Smriti Van
 
:  Available
xx
Fire fighting arrangement
 
:  Working/to be replaced
xxi
Last date of cleaning of
(a)   Septic tank
(b)   Water tanks
 
:31/05/09
:  31.05.10
xxii
Whether area around transformer is fenced
:  Yes 
xxiii
Whether open wells, if any, are covered from top
:   open well is situated outside the campus(not covered)
xxiv
Works taken up under M&R fund during current year and last year:-
 
:
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
 2009-10
 Painting:compound wall,gates,washing platforms,academic block,adminblock,guest house,kitchen,platestand
Lying of tiles to toilet and bath rooms:boys dormetry
Whitewash block,boys,gals,dining hall,washing point ,admin block.:academic
Floor coat:admin block,academic block
Master septic tank:emptying and cleaning